WP12: System control

Summary of information related to WP12 This Work Package determines the changes that are needed to be implemented in the existing EISCAT system control software (EROS) in order to control a system on the scale envisaged for EISCAT_3D with sufficient flexibility and programmability. The FP6 Design Study concluded that the Read more…

WP6: Performance specification

Summary of information related to WP6 November 10, 2010 A performance specification is essential to provide a framework for all the technical activities to be undertaken during the EISCAT_3D Preparatory Phase. The preparation of an initial performance specification was already undertaken at the start of the FP6-funded EISCAT_3D Design Study. Read more…

WP5: Consortium building

Summary of information related to WP5 November 10, 2010 Before EISCAT_3D can proceed to the implementation stage, three essential activities have to be completed. Firstly, the consortium of funding bodies which will support the new infrastructure must be identified and their contribution levels must be clarified. Secondly, a firm overview Read more…